Stage 3 - Testing & Verification

Product Ref: Stage 3 - Testing & Verification

Enquire about product

Product Description

Stage 3: Testing & Verification

This involves the following steps briefly outlined below.

1) Horn Testing:

  • All horns are tested in-house in our purpose built 5 Mtr Anechoic Test Room or Anechoic Chamber.
  • Decibel levels are set to customers specifications.
  • Decibel Readings are recorded and logged.
  • The quality, consistency and clarity of the horn tone is checked to ensure it meets specification.

2) Valve Testing:

  • All valves are tested in-house.
  • Testing is carried out using our purpose built testing jigs.
  • Valves are put through a variety of tests to ensure they are functioning to the required specification.
  • All test results are recorded and checked to ensure they meet the required specification.

3) Gauge Testing:

  • All Gauges are calibrated in-house in our temperature controlled calibration room.
  • Gauge calibration is carried out using nitrogen (lower pressure) or oil (higher pressure).
  • All calibration results are recorded and checked to ensure they meet the required specification.
  • Calibration Certificates Of Conformity can be supplied upon request.