Stage 2 - Work In Progress

Product Ref: Stage 2 - Work In Progress

Enquire about product

Product Description

Stage 2: "W.I.P" - Work In Progress

This involves the following steps briefly outlined below.

1) Disassembly:

  • All "Dirty" items in for overhaul are individually disassembled within our purpose built "Dirty Room".
  • All items are disassembled in accordance with an approved Trent worksheet specific to that particular item.
  • Once disassembled, all components are fully inspected for damage, corrosion, general wear and tear or any non conforming parts.
  • All perishable parts are discarded (O-Rings, Gaskets, Seals etc).

2) Repair / Reworking:

  • Parts that require repairing or additional reworking are transfered to our purpose built "Material Off" Room.
  • Fully equipped with an Industrial lathe, Milling machine, Drill Presses, Wire and Grinding Wheels.
  • Drilling and Tapping Facilities.
  • Industrial Sandblaster.

3) Cleaning:

  • We employ a wide variety of cleaning methods tailored specifically to achieve optimal results for that particular item.
  • We use Industry approved cleaning products.

4) Assembly:

  • All items are individually assembled within our "Clean Areas".
  • All items are assembled in accordance with an approved Trent worksheet specific to that particular item.
  • All perishable parts are replaced with new OEM parts (O-Rings, Gaskets, Seals etc).
  • All lubricants are Industry approved products.

5) Paint:

  • Overhauled items that require a painted finish, will undergo this process on completion of all the relevant repairs & testing.
  • A fully equipped purpose built Spray Room provides the correct environment for achieving a high quality finish.
  • All items are degreased prior to paint, then 2 Coates of Primer are applied followed by 2 Coates of the finishing top colour.
  • Working to our "Trent Paint Doc 100" guidelines to achieve a consistent quality finish every time.